Work

Engagements

Client names withheld under NDA. Each engagement is described by its shape — the starting state, the constraint, and what we left behind.

Insurance

Image Services consolidation

A claims archive spread across ageing Image Services hardware, with retention obligations that made deletion impossible and no supported upgrade path. Content and its index data were profiled, mapped and moved into a single P8 object store, with annotations and audit history preserved and every document reconciled against the source count.

Starting state
Image Services, unsupported release
Constraint
Regulatory retention, no content loss tolerated
Left behind
Reconciliation pack and operational runbooks
Banking

Records-managed rollout

An existing P8 estate needed a defensible retention story and a front end business users would actually adopt. IBM Content Navigator was configured against the existing object stores with a records plan built on Enterprise Records, and desk-level training delivered to the teams inheriting it.

Starting state
P8 repository, no records management layer
Constraint
Audit deadline fixed
Left behind
File plan, ICN configuration, trained administrators
Manufacturing

Cross-version upgrade

An engineering drawing repository several versions behind support, running on a deprecated application server. The upgrade was staged side by side so production was never rebuilt in place, with the application repointed at cutover after a rehearsed delta run.

Starting state
Out-of-support P8, legacy app server
Constraint
Short weekend cutover window
Left behind
Upgrade runbook and rollback plan